Eddleston Water Project - publications & other media

Leaflets
The Eddleston Water Project (2015) - updates the project works completed

Reports
• Early Change in the Physical Habitat and the Macroinvertebrate Community in the Eddleston Water in Response to Channel Re-Configuration 2012-2015 (2017)
• Eddleston Water Project Report (2016)
• Creating habitat mosaics: Implementing Natural Flood Management Measures: a series of non-technical summaries, Case Study 7 (2015)
• Re-meandering of a straightened watercourse (Cringletie/Lake Wood): Implementing Natural Flood Management Measures: a series of non-technical summaries, Case Study 6 (2015)
• Re-meandering of a straightened watercourse (Shiphorns/Shiplaw): Implementing Natural Flood Management Measures: a series of non-technical summaries, Case Study 5 (2015)
• a map highlighting all the work that has been done by the project (2015)
•  detailed information on the outputs from project partner British Geological Survey
• a report on historical (ca. 1750-1860) modifications to the Eddleston Water and its tributaries (Apr 2012)
• a report modelling the main river from Eddleston to Peebles, which assesses the opportunities and efficacy for restoration and flood attenuation at a number of key sites  (Apr 2011)
• a report on the surface water monitoring network  (Mar 2011)
• the initial scoping study that assessed the status of the river, the potential for restoration and how various parameters could be measured (July 2010)

Posters
• a research poster looking at how flood flows and ecosystems services might change after natural flood management measures are in place

Presentations
Eddleston Hydrometric Network - latest update (Feb 2012)
Eddleston Water Tributary Modelling (Feb 2012)


 

About This Site
About Tweed Forum
Registered Office:
South Court,
Drygrange Steading,
Melrose, Roxburghshire
TD6 9DJ
Tel. +44 (0)1896849723
© Copyright Tweed Forum 2011